THE CHALLENGE
As part of the Craigieburn Rd duplication works many of the existing services required relocation or protection. The extensive upgrade works required various movements of heavy equipment and sub-grade preparation. As part of this sub-grade preparation, unsuitable material needed to be removed and replaced with class specific material, and compacted to design requirements using heavy vibrating rollers. It is this additional load bearing and vibration which presented risk to the existing services and a solution was required to protect the assets.
OUR SOLUTION
The project and asset owners solution was to encase services that could be a risk in stabilised sand. To achieve this we deployed multiple hydro excavation units to safety remove the soil surrounding the assets, ensuring that the assets were still supported throughout the process. Following this the assets were inspected and a specified layer of stabilised sand was used to encase the asset, increasing its load resistance and protecting it from vibration.
THE RESULTS
Construction of the additional lanes was enabled without the risk of damaging any of the existing infrastructure.
Get in touch with Livic Underground Construction for innovative solutions in civil infrastructure.
Our team is ready to discuss and support your project needs.
Learn more about our services by downloading our Capability Statement.
Your trusted infrastructure partner committed to delivering high-standard civil construction services.
© Livic Underground Pty Ltd 2024 | ABN: 74 652 933 009 | Privacy Policy
Website by IONYX Digital