THE CHALLENGE
The project involved installing parallel networks within an asbestos remediation zone that had been heavily reinstated using cement-treated material, all within an area subject to significant electromagnetic interference (EMI).
Our team is accustomed to operating safely around heavy plant, machinery, and other trades; however, this project presented a distinct set of challenges. While the scope of works was relatively standard, the conditions were far from typical. Legacy contaminants, variable ground conditions, and multiple active work fronts — combined with large plant emitting high levels of EMI that interfered with our tracking equipment — required adaptive planning, close coordination, and heightened control measures to maintain both accuracy and safety on site.
OUR SOLUTION
Given the site’s history of contamination, additional preparation and stringent controls were implemented to mitigate any potential risk of exposure to personnel. Comprehensive measures relating to PPE use, material handling, and decontamination were established to ensure the safety and wellbeing of all team members.
While the ground conditions were manageable with the appropriate equipment, electromagnetic interference (EMI) presented a unique challenge, as it can affect all sensitive electronic systems. In such circumstances, the only true control for EMI is the complete shutdown of electrical sources — a measure rarely permitted under most project schedules. To address this, our team adopted an agile approach, rapidly transitioning to night-shift operations to maintain programme integrity and deliver outcomes without disrupting other critical daytime works.
THE RESULTS
By implementing a rapid response process and maintaining clear, effective communication with the client, we were able to swiftly mobilise a night-shift crew to take control of the project and deliver a cost-effective outcome.

Get in touch with Livic Underground Construction for innovative solutions in civil infrastructure.
Our team is ready to discuss and support your project needs.
Learn more about our services by downloading our Capability Statement.
Your trusted infrastructure partner committed to delivering high-standard civil construction services.
© Livic Underground Pty Ltd 2024 | ABN: 74 652 933 009 | Privacy Policy
Website by IONYX Digital